Central Midlands Hydrotherapy Pool

LocationMoora WA
ClientShire of Moora
Project Cost$500k - $1Million

As part to the new Moora Health Care Development, a new Hydrotherapy Pool was required to aid in rehabilitation of residents. The New Concrete Swimming Pool was designed by Aquatic One with full design to Structural, Finishes and Pool Water Treatment Plant. The pool, wet deck gutters and tanks were waterproofed and fully tiled using Metz Commercial Pool Tiles. Custom manufactured stainless steel handrails were installed to the ramp and perimeter.

The Pool Water Treatment System was expertly designed by Aquatic One. The new PWT system comprised of;

  • Waterco Media Filters.
  • VSD Pumps, Hair and Lint Strainers.
  • Electrical Switchboard and Control Panels with Full Automation Control and 10 Inch Touchscreen.
  • ProCal Calcium Hypo Feeder and Sulphuric Acid System Dosing.
  • DiaLog Chemistry Analysers & Controllers.
  • Electric Heat Pumps.
  • Miscellaneous Plant.

The project was completed on time and within budget.