| Location | Moora WA |
| Client | Shire of Moora |
| Project Cost | $500k - $1Million |
As part to the new Moora Health Care Development, a new Hydrotherapy Pool was required to aid in rehabilitation of residents. The New Concrete Swimming Pool was designed by Aquatic One with full design to Structural, Finishes and Pool Water Treatment Plant. The pool, wet deck gutters and tanks were waterproofed and fully tiled using Metz Commercial Pool Tiles. Custom manufactured stainless steel handrails were installed to the ramp and perimeter.
The Pool Water Treatment System was expertly designed by Aquatic One. The new PWT system comprised of;
The project was completed on time and within budget.