| Location | Adelaide, SA |
| Client | Sarah Constructions (Department of Infrastructure and Transport SA) |
| Project Cost | $20-25million |
The Adelaide Aquatic Centre project has delivered a new state-of-the-art facility designed through collaboration between Australia’s leading architects, engineers, aquatic consultants, Sarah Constructions (Main Contractor) and Aquatic Project Solutions. The team-based approach to the design and construction of this project ensured that the very best construction methodologies were utilised to deliver a high-quality, time-efficient and cost-effective outcome.
The new aquatic centre features seven pools, with every pool including disability access ramps and hoists.
APS was engaged by the Main Contractor, Sarah Constructions, under a Design & Construct contract for the entire Aquatic Works package. Collaborating with and coordinating the industry’s most experienced trades and professionals, APS oversaw the design, construction, and installation of all structural, hydraulic, finishes, and fit-out elements for the entire project. The project has now been successfully completed, with APS delivering the works on time and within budget.
© Aquatic Project Solutions 2026